Posts

Call the #1 USA Manufacturer Right Now!

American products… made by American metalworkers… for American contractors and their crews!

We make thousands of concrete construction products, some you already know and others you need to learn more about:

Floor Dowels (new doweling systems)

Stud Rail (column-to-deck reinforcement)

Taper Ties (for most gangform systems)

Walers (butt plate and double channel)

SurePly (handset forming system)

Staybox (rebar splicing system)

Form Ties (for almost any system)

Snap Ties (for plywood forming)

Coil Rod (multi-purpose forming)

Metal Rib (expanded metal mesh)

Steel Stakes (multi-purpose forming)

Tilt-Up (including engineering services)

Pipe Braces (big sizes, quick turnaround)

Window Wells (wells, ladders and grates)

Take a Look at All the Options!

Your customers will be floored by the new dowel and joint systems for concrete slabs and pavements. Stop searching for suppliers and call SureBuilt right now!

Taper Dowels

The diamond-shape Taper Dowel provides concrete joint stability, reliable load transfer and smooth slab-to-slab transition, without restraining floor movement. The plastic sleeve is nailed to lumber edge forms before concrete placement and the steel plate slides into the sleeve after the forms are removed.

Dowel Baskets

The Dowel Basket is a cost-effective assembly for large-scale floors and pavements. Each twelve-foot assembly is built to match the dowel spacing shown in the project specifications. The plastic sleeve allows movement and the flat plate provides maximum bearing and smooth slab-to-slab transition.

Steel Edge Nosing

High-traffic industrial floors and pavements require precise load transfer, joint stability and joint protection. These requirements are met with an assembly that includes the steel edge, studs, dowel plates and full-depth channel. The leave-in-place design eliminates conventional slab edge forming costs.

Dowel Sleeves – Construction Joint (CJ)

Positioning dowels with lumber edge forms is easy with the plastic Dowel Sleeve and Nailing Plate. The plate is simply nailed to the form and the sleeve is pushed onto the plate. When the lumber edge forms are removed, a smooth steel dowel is placed into the exposed sleeve for the adjoining concrete slab.

Dowel Sleeves – Expansion Joint (EJ)

Positioning dowels with leave-in-place expansion board, like cedar or polypropylene, is easy with this Dowel Sleeve. Expansion boards are pre-drilled for proper spacing and the sleeves are snapped into place. The integrated collar tabs keep each sleeve in position and perpendicular to the board face.



New Dowel Basket for Slabs!SureBuilt Dowel Basket Assembly, an engineered laod-transfer system for concrete construction joints and pavements

We know how to make ’em… and we’re making a lot of ’em… the sparks are really flying!

The new Dowel Basket provides joint stability, load transfer and slab transition, in a single cost-effective assembly. You’ll be surprised by all the sales opportunities hiding in concrete floors and pavements.

Dowel Baskets are recommended for joints up to 0.20” wide and suitable for all types of ground level concrete floors, slabs or pavements:

  • A unique high-density plastic sleeve and steel plate, with engineered spacing, optimizes the steel and geometry for efficient load SureBuilt Dowel Baskets are suitable for all types of ground level concrete slabs, such as jointed floors, flatwork and pavement.transfer.
  • The plate provides for maximum bearing, bending and punching resistance, while managing typical concrete curling and shrinking.
  • Considered to be an acceptable method in accordance with ACI 302.1R Guide for Concrete Floor and Slab Construction and ACI 360 Design of Slabs-on-Ground.

Click here for to see all the Floor Dowels and Joints Systems available at SureBuilt.

Click here to view or download the Floor Dowel and Joint System brochure (PDF)

SureBuilt Floor Dowels from SureBuilt Concrete Forms & Accs. on Vimeo.

I Mean a High Chair!

When your customers need High Chairs, start with SureBuilt.Individual High Chairs for supporting reinforcement bars in concrete

We have chairs that meet almost every project spec. Just give us the quantity, size and finish so we can get started on your order.

We have sizes from 1″ to 12″, in 1/2″ increments, with any fractional height in between.

We have Plain, Plastic-Dipped or Plastic-Tipped (pictured). We can also provide an optional epoxy coating or galvanized finish.

We designed the High Chair legs to span and straddle lower bars, while “cradling” upper bars at the specified elevation.

We spot-weld the chair legs to resist bending, maintaining proper concrete cover while supporting the rebar.

Check the Price List for more information or contact your SureBuilt representative to learn about all the Bar Support products we offer.

Go For The Win!

We’ve been making all kinds of ties, for all kinds of concrete forming systems, for a very long time. We have all the different styles, sizes, capacities and options you need for your customers and their project requirements.SureBuilt Concrete Form Ties

And don’t forget the hardware!

We have Jahn-style Clamps, Plate Washers, Coil Nuts, Wedge Bolts, Inner Units and Euro Wing Nuts… all the things that hold the ties and forming system together.

Check the Price List for styles, sizes, capacities and options, then contact your SureBuilt representative for pricing and availability.

With Snap Tie Forming!

Job-built forming with snap ties and plywood

Job-built forming with plywood, 2×4 lumber, Snap Ties and Jahn-style brackets, is popular on many construction sites around the country. Though only a few components are required, sufficient time and labor are necessary to plan, mark, cut and drill the plywood.

Jahn-style Waler Brackets are the preferred choice of many concrete contractors. This bracket centers and captures the tie, while supporting a 2×4 waler across the top. An “ear” plate swivels to secure the assembly for concrete placement.

Snap ties are used for job-built forming with plywood

Short-end (SE) Snap Ties are used for single 2×4 waler setups. Long-end (LE) Snap Ties are used for waler/strongback combinations. Odd-end (OE) Snap Ties are used when forming with a single waler on one side and a waler/strongback combination on the other side. All Snap Ties are made to break back below the concrete wall surface.

When long-end ties are used, the Jahn-style Strongback Bracket is needed. This bracket captures the tie, horizontal 2×4 waler and vertical 2×4 strongbacks. An “ear” plate swivels to secure the assembly for concrete placement.

.

Don’t Mesh Around… Get Metal Rib!Metal Rib - Stay in place Form

It’s time to give your customers a sample of Metal Rib and see how creative they can be. Here are just a few ideas to get them thinking:

– Easy to cut, lap, splice, bend and pierce; adapts to all kinds of forming, like footings, bulkheads, grade beams and pier caps.

– Saves time because the sheet remains in place, only the bracing is removed, eliminating form stripping.

Concrete Construction - Metal Rib Stay Form

– Simplifies forming joints so rebar operations can continue, or be revised, with minimal obstructions.

– Can be tied to existing rebar in structures, like grade beams and pier caps, to eliminate temporary supports.

– Provides a quick-to-install joint option in the event of ready-mix interruption or other unanticipated problems.

Make sure you always have Metal Rib leave-in-place mesh on hand. Add a skid to your next shipment.

 

Well Done!

  • American made
  • Heat-treated point
  • Spiral hole pattern
  • Standard sizes
  • Convenient package
  • Ready-to-ship

Yet another item made in the largest US factory dedicated to concrete forming products. With 320,000 square feet of manufacturing in Bellwood, we’re making and shipping more products than ever. And that doesn’t include the capacity at the other SureBuilt locations in Tampa, Houston and Los Angeles.

Watch the clip and see for yourself, then contact your SureBuilt rep for Steel Stake pricing and availability.