Loop Box Technical Data Sheet
Loop Box
Wire rope loop connection for precast concrete walls
Precast concrete walls can be connected with
single and double wire Loop Boxes. Loop Boxes
are installed to the formwork according to the
spacing specified by the designer, before the
panel is produced. After removing the formwork,
the protective tape is removed, and the loop is
bent out and straightened.
Wall panels are installed and supported
according to plans. A vertical rebar is installed
into a joint through the loops, and the horizontal
position of the loops is checked. After completion
of the formwork, the joint is finished by pouring
or pumping the grout into the joint.
Single and Double Loop Boxes
•
•
•
•
Advantages
Ideal alternative to connections or anchor
channels
Easy Installation, thus practical application
Secure Connection of elements with mortar
or grout.
Also available for lightweight elements.
* 7*7 or 7*19, 6mm, 1770 MPA High Strength Wire Rope
** Safety factor 4:1
|
Single Wire Connecting Loop |
||||
|
Part No. Type Box Size W.L.L. Weight |
||||
|
mm |
lbs |
lbs |
||
|
SBSWCL-060 |
60 |
160x50x20 |
1343 |
0.42 |
|
SBSWCL-080 |
80 |
160x50x20 |
1343 |
0.44 |
|
SBSWCL-100 |
100 |
160x50x20 |
1343 |
0.46 |
|
SBSWCL-120 120 160x50x20 1343 0.48 |
||||
|
Part No. |
Type |
Wire Dia |
Box Size |
W.L.L. |
Weight |
|
mm |
mm |
lbs |
lbs |
||
|
SBDWCL-080 |
80 |
5 |
160x50x20 |
2238 |
0.57 |
|
SBDWCL-100 |
100 |
5 |
202x50x20 |
2238 |
0.60 |
|
SBDWCL-120 |
120 |
5 |
202x50x20 |
2238 |
0.64 |
|
SBDWCL-80 |
80 |
6 |
160x50x20 |
2686 |
0.66 |
|
SBDWCL-100 |
100 |
6 |
202x50x20 |
2686 |
0.70 |
|
SBDWCL-120 120 6 202x50x20 2686 0.74 |
Double Wire Connecting Loop
* 7*19, 1770 MPA High Strength Wire Rope
**Safety factor 4:1
2525 Armitage Ave
Melrose Park, IL 60160
708-493-9569
www.surebuilt-usa.com
03/26Installation to the Mold
The connection loops are installed to the mold by
fixing them by nails through the holes in the box. The
flexible steel wire is installed among the reinforce-
ment. The wire cables do not need to be fixed to the
surrounding reinforcement. If necessary the boxes
can be used without wire cables just for forming the
pegs, but in that case the capabilities are not valid.
Installation at the Site
The protection tapes and the plastic shelter deck are
removed from the casting boxes. The connecting
loops are folded out from the boxes before install-
ing the elements. The wire loops can be folded out
without tools if necessary. The vertical rebars are in-
stalled through all the loops as soon as the elements
are installed. After the installation the casting of the
joint can be completed.Loop Boxes Applications Loop Boxes placed in forms
Loop Boxes placed in forms Loop Boxes in precast wall panels