Heavy Duty Bridge Overhang Bracket Data Sheet

Heavy Duty Bridge Overhang Brackets

Adjustable overhang deck support for structural steel

and precast concrete beams

These brackets can be used with an appropriate

3/4” exterior hanger, such as the Type 9-A and

9-AB. Heavy Duty Bridge Overhang Brackets

are fabricated with nail holes in the top of the

horizontal member for securing the required

lumber nailer to the bracket.

A guard rail receptacle, which allows for attaching

a 2” x 4” guard rail post, is built into the outboard

end of the bracket’s horizontal member. The brack-

et can be easily and quickly preset on the ground

and then set in place as needed. An outboard ad-

justment nut controls the vertical movement of the

outboard end of the bracket to accommodate set-

ting the overhang formwork to final grade.

90” Heavy Duty Bridge Overhang Bracket

Heavy Duty Bridge Overhang Brackets

Part No.

Description

Channel

Length

*Vertical

Adjustment

Coil Rod

Diameter

**SWL

(lbs)

Total Section

Modulus

Moment

of Inertia

SBBOBHD

72” HD BOB

72”

28” to 66”

3/4”

6,000

2.375

4.7502

SBBOBHDL

90” HD BOB

90”

30” to 68”

3/4”

6,000

4.118

12.355

Overhang Brackets are usually adjusted to the

proper grade during the normal “dry run” opera-

tion. Typically, the overhang forms are set 1/4” to

3/8” above finished grade to compensate for dead

load deflection. The Heavy Duty Bridge Overhang

Bracket is designed for maximum adjustment and

strength to meet the varied overhang forming re-

quirements of the various State D.O.T.

* Vertical adjustment in 2” increments

** Safe Working Load (SWL) based on 2:1 safety factor of axial load in diagonal leg.

Made in the USA available

72” Heavy Duty Bridge Overhang Bracket

SAFETY NOTE:

DO NOT attempt an upward adjustment of the

bracket during the concrete pouring opera-

tion. DO NOT lower the bracket during the

concrete pour.

2525 Armitage Ave

Melrose Park, IL 60160

708-493-9569

www.surebuilt-usa.com

03/26EXTERIOR HANGER SPACING FOR HEAVY DUTY BRIDGE OVERHANG BRACKET

For Use On Steel Girders 3’-0” To 4’-0” Overhang

BOBHD BRIDGE OVERHANG BRACKET AND EXTERIOR HANGER SPACING (ft.)

DESIGN

LOAD

PSF

OVERHANG

THICKNESS

MAX.

BRACKET “D”

DIMENSION

0 500 SCREED LOAD PER BRACKET (lb) 1,000 1,500 2,000 2,500 3,000

7′-2″ 6′-6″ 5′-11″ 5′-0″ 4′-0″ 3′-6″ 3′-0″ 30″

8′-0″ 8′-0″ 6′-6″ 5′-6″ 4′-6″ 3′-6″ 3′-3″ 7′-2″ 6′-6″ 5′-11″ 5′-3″ 4′-8″ 4′-0″ 3′-4″ 157 8″

50″

8′-0″ 8′-0″ 8′-0″ 8′-0″ 7′-7″ 6′-9″ 6′-3″ 7′-2″ 6′-6″ 5′-11″ 5′-3″ 4′-8″ 4′-0″ 3′-4″ 68″

8′-0″ 8′-0″ 8′-0″ 8′-0″ 7′-7″ 7′-0″ 6′-4″ 6′-5″ 5′-10″ 5′-3″ 4′-8″ 3′-6″ 3′-0″ 2′-6″ 30″

8′-0″ 7′-0″ 6′-6″ 5′-10″ 4′-10″ 3′-11″ 3′-0″ 6′-5″ 5′-10″ 5′-3″ 4′-8″ 4′-2″ 3′-7″ 3′-0″ 184 10

50″

8′-0″ 8′-0″ 7′-11″ 7′-4″ 6′-10″ 6′-3″ 5′-6″ 6′-5″ 5′-10″ 5′-3″ 4′-8″ 4′-2″ 3′-7″ 3′-0″ 68″

8′-0″ 8′-0″ 7′-11″ 7′-4″ 6′-10″ 6′-3″ 5′-8″ 5′-10″ 5′-3′ 4′-9″ 4′-3″ 3′-9″ 3′-2″ 2′-6″ 30″

8′-0″ 7′-3″ 6′-4″ 5′-5″ 4′-6″ 3′-7″ 2′-10″ 5′-10″ 5′-3″ 4′-9″ 4′-3″ 3′-9″ 3′-3″ 2′-8″ 210 12″

50″

8′-0″ 7′-8″ 7′-2″ 6′-8″ 6′-2″ 5′-7″ 5′-1″ 5′-10″ 5′-3″ 4′-9″ 4′-3″ 3′-9″ 3′-3″ 2′-8″ 68″

8′-0″ 7′-8″ 7′-2″ 6′-8″ 6′-2″ 5′-7″ 5′-1″ 5′-3″ 4′-9″ 4′-4″ 3′-10″ 3′-4″ 2′-10″ 2′-3″ 30″

7′-6″ 6′-9″ 5′-11″ 5′-0″ 4′-2″ 3′-4″ 2′-7″ 5′-3″ 4′-10″ 4′-4″ 3′-10″ 3′-5″ 2′-11″ 2′-5″ 237 14″

50″

7′-6″ 7′-0″ 6′-6″ 6′-0″ 5′-6″ 5′-1″ 4′-6″ 5′-3″ 4′-10″ 4′-4″ 3′-10″ 3′-5″ 2′-11″ 2′-6″ 68″

7′-6″ 7′-0″ 6′-6″ 6′-1″ 5′-7″ 5′-1″ 4′-8″ 7’ 1-3/4” Max

NOTES:

1. Design load calculations include 160 pcf for con-

crete and formwork plus 50 psf for live loads,

equipment and materials. Walkway (38”) is also

considered by adding a live load of 50 psf, plus

75 plf vertical load at outside edge of overhang.

2. Check overhang lumber falsework for the se-

lected spacing.

3. Spacing in chart is based on bolt holder con-

nected at 19 5/8” = “A” dimension.

4. For use with 2×6 type guard rail receptacle (BOB-

GRR26).

WARNING:

To support a mechanical type finishing machine it is

recommended to use an interlocking type exterior

hanger.

3’ to 4’ Overhang

“D”

HANGER

SWL (lb)

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300EXTERIOR HANGER SPACING FOR HEAVY DUTY BRIDGE OVERHANG BRACKET

for Use on steel Girders 4’-0” to 5’-0” overhang

BOBHD BRIDGE OVERHANG BRACKET AND EXTERIOR HANGER SPACING (ft.)

DESIGN

LOAD

PSF

OVERHANG

THICKNESS

MAX.

BRACKET “D”

DIMENSION

0 500 SCREED LOAD PER BRACKET (lb) 1,000 1,500 2,000 2,500 3,000

6′-4″ 5′-9″ 4′-11″ 4′-1″ 3′-2″ 2′-4″ 1′-5″ 30″

7′-3″ 6′-2″ 5′-3″ 4′-4″ 3′-6″ 2′-6″ 1′-8″ 6′-4″ 5′-9″ 5′-2″ 4′-8″ 4′-1″ 3′-6″ 2′-11″ 157 8″

50″

8′-0″ 8′-0″ 7′-10″ 7′-3″ 6′-8″ 6′-2″ 5′-3″ 6′-4″ 5′-9″ 5′-2″ 4′-8″ 4′-1″ 3′-6″ 2′-11″ 68″

8′-0″ 8′-0″ 7′-10″ 7′-3″ 6′-8″ 6′-2″ 5′-7″ 5′-7″ 5′-1″ 4′-4″ 3′-7″ 2′-10″ 2′-1″ 1′-4″ 30″

6′-7″ 5′-6″ 4′-9″ 3′-11″ 3′-1″ 2′-4″ 1′-6″ 5′-7″ 5′-1″ 4′-7″ 4′-1″ 3′-7″ 3′-1″ 2′-7″ 184 10

50″

7′-10″ 7′-5″ 6′-11″ 6′-5″ 5′-11″ 5′-5″ 4′-8″ 5′-7″ 5′-1″ 4′-7″ 4′-1″ 3′-7″ 3′-1″ 2′-7″ 68″

7′-10″ 7′-5″ 6′-11″ 6′-5″ 5′-11″ 5′-5″ 4′-11″ 5′-0″ 4′-6″ 3′-10″ 3′-2″ 2′-6″ 1′-10″ 1′-2″ 30″

6′-0″ 5′-1″ 4′-3″ 3′-7″ 2′-10″ 2′-1″ 1′-4″ 5′-0″ 4′-6″ 4′-1″ 3′-8″ 3′-2″ 2′-9″ 2′-4″ 210 12″

50″

7′-0″ 6′-7″ 6′-2″ 5′-8″ 5′-3″ 4′-10″ 4′-4″ 5′-0″ 4′-6″ 4′-1″ 3′-8″ 3′-2″ 2′-9″ 2′-4″ 68″

7′-0″ 6′-7″ 6′-2″ 5′-8″ 5′-3″ 4′-10″ 4′-4″ 4′-6″ 4′-1″ 3′-6″ 2′-10″ 2′-3″ 1′-8″ 1′-0″ 30″

5′-5″ 4′-7″ 3′-11″ 3′-3″ 2′-7″ 1′-11″ 1′-3″ 4′-6″ 4′-1″ 3′-8″ 3′-3″ 2′-11″ 2′-6″ 2′-1″ 237 14″

50″

6′-4″ 5′-11″ 5′-7″ 5′-2″ 4′-9″ 4′-4″ 3′-11″ 4′-6″ 4′-1″ 3′-8″ 3′-3″ 2′-11″ 2′-6″ 2′-1″ 68″

6′-4″ 5′-11″ 5′-8″ 5′-2″ 4′-9″ 4′-4″ 3′-11″ 7’ 1-3/4” Max

4’ to 5’ Overhang

NOTES:

1. Design load calculations include 160 pcf for concrete and

formwork plus 50 psf for live loads, equipment and materials.

Walkway (26”) is also considered by adding a live load of 50

psf, plus 75 plf vertical load at outside edge of overhang.

2. 3. Check overhang lumber falsework for the selected spacing.

Spacing in chart is based on bolt holder connected at 19 5/8”

= “A” dimension.

4. For use with 2×6 type guard rail receptacle (BOBGRR26).

WARNING:

To support a mechanical type finishing machine

it is recommended to use an interlocking type

exterior hanger.

“D”

HANGER

SWL (lb)

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300EXTERIOR HANGER SPACING FOR HEAVY DUTY BRIDGE OVERHANG BRACKET

for Use on concrete beam 3’-0” to 4’-0” overhang

BOBHD BRIDGE OVERHANG BRACKET AND EXTERIOR HANGER SPACING (ft.)

DESIGN

LOAD

PSF

OVERHANG

THICKNESS

MAX.

BRACKET “D”

DIMENSION

0 500 SCREED LOAD PER BRACKET (lb) 1,000 1,500 2,000 2,500 3,000

6′-6″ 5′-11″ 5′-2″ 3′-10″ 2′-6″ 1′-6″ 1′-0″ 30″

7′-10″ 6′-4″ 5′-2″ 3′-10″ 2′-6″ 1′-6″ 1′-0″ 6′-6″ 5′-11″ 5′-4″ 4′-9″ 4′-2″ 3′-7″ 3′-0″ 157 8″

50″

8′-0″ 8′-0″ 8′-0″ 7′-6″ 6′-4″ 5′-0″ 4′-9″ 6′-6″ 5′-11″ 5′-4″ 4′-9″ 4′-2″ 3′-7″ 3′-0″ 68″

8′-0″ 8′-0″ 8′-0″ 7′-6″ 6′-11″ 6′-4″ 5′-9″ 5′-10″ 5′-4″ 4′-9″ 3′-6″ 2′-3″ 1′-0″ 30″

7′-3″ 5′-9″ 4′-9″ 3′-6″ 2′-3″ 1′-0″ 5′-10″ 5′-4″ 4′-9″ 4′-3″ 3′-9″ 3′-3″ 2′-8″ 184 10

50″

8′-0″ 7′-6″ 7′-2″ 6′-8″ 5′-11″ 4′-9″ 4′-6″ 5′-10″ 5′-4″ 4′-9″ 4′-3″ 3′-9″ 3′-3″ 2′-8″ 68″

8′-0″ 7′-6″ 7′-2″ 6′-8″ 6′-2″ 5′-7″ 5′-0″ 5′-3″ 4′-9″ 4′-3″ 3′-3″ 2′-1″ 30″

6′-9″ 5′-4″ 4′-5″ 3′-3″ 2′-1″ 5′-3″ 4′-9″ 4′-3″ 3′-10″ 3′-4″ 2′-11″ 2′-5″ 210 12″

50″

7′-5″ 6′-11″ 6′-5″ 6′-0″ 5′-5″ 4′-3″ 4′-2″ 5′-3″ 4′-9″ 4′-3″ 3′-10″ 3′-4″ 2′-11″ 2′-5″ 68″

7′-5″ 6′-11″ 6′-5″ 6′-0″ 5′-6″ 5′-1″ 4′-6″ 4′-9″ 4′-4″ 3′-11″ 3′-0″ 1′-11″ 30″

6′-3″ 5′-0″ 4′-1″ 3′-0″ 1′-11″ 4′-9″ 4′-4″ 3′-11″ 3′-6″ 3′-1″ 2′-8″ 2′-3″ 237 14″

50″

6′-9″ 6′-4″ 5′-10″ 5′-5″ 5′-0″ 4′-0″ 3′-6″ 4′-9″ 4′-4″ 3′-11″ 3′-6″ 3′-1″ 2′-8″ 2′-3″ 68″

6′-9″ 6′-4″ 5′-10″ 5′-5″ 5′-0″ 4′-7″ 4′-0″ NOTES:

1. Design load calculations include 160 pcf for concrete

and formwork plus 50 psf for live loads, equipment

and materials. Walkway (38”) is also considered by

adding a live load of 50 psf, plus 75 plf vertical load at

outside edge of overhang.

2. Check overhang lumber falsework for the selected

spacing.

3. Spacing in chart is based on bolt holder connected

at 14-5/8” = “A” dimension.

4. For use with 2×6 type guard rail receptacle (BOB-

GRR26).

WARNING:

To support a mechanical type finishing machine

it is recommended to use an interlocking type

exterior hanger.

7’ 1-3/4” Max

3’ to 4’ Overhang

“D”

HANGER

SWL (lb)

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

8,000

11,300

File Type: pdf