Panel Base Connector

Panel Base Connector*

Eliminate misaligned embed plates and field welding by

bolting panels directly to the foundation

The Panel Base Connector is easy to position and

fasten at the bottom edge of the form. It can be

placed in either a face-up or face-down orientation

depending on the forming and handling preference.

The high-strength, purpose designed drill-in 3/4”x10”

screw anchor provides an immediate and secure

connection when tightened. There is no grout set-up

or wait time.

The connection is centered in the concrete panel,

minimizing moment and eccentric forces in the

design, and resisting in-plane tension and out-of-

plane shear forces.

The connection provides a nominal capacity in

excess of 10 Kips for tension, meeting the applicable

Note: 7” Screw Anchor

ACI requirements.

engagement required

The relatively small access area is easy to grout,

providing complete embedment and encapsulation

for corrosion protection.

Meets ACI integrity requirements of ACI-318 -11

16.5.1.3(b) ACI318-14 16.2.4.3(b), ACI-318-19

16.2.4.3 (b), and ACI 551.2R-15 Chapter 8.

Average tensile test value is 34,896 lbs in 6,555

psi concrete. Conversion from psi to tensile:

6000 psi = 33,381 lbs

5000 psi = 30,472 lbs

4000 psi = 27,255 lbs

3000 psi = 23,604 lbs

Testing observed and verified

by a Professional Engineer.

Panel Base Connector Kit

Part No. Description

SBPBC34HD10KIT Panel Base Connector Kit w/ 3/4” x 10” Screw Anchor

SBPBC34HD12KIT Panel Base Connector Kit w/ 3/4” x 12” Screw Anchor

* 12” available if spacing between bottom of panel and footing is more than 2”.

* Patent No.: U.S. 11,891,790

2525 Armitage Ave

Melrose Park, IL 60160

708-493-9569

www.surebuilt-usa.com

09/26Basic Installation

1. Position and fasten the Panel Base Connector to the desired

location(s) in the bottom edge of panel formwork using the holes

provided.

2. Cast, lift, handle and erect the completed panel on the concrete

footing or foundation as typical.

3. Remove the foam cover from the face of Panel Base Connector.

4. Drill a minimum 3/4” x 7” hole, using a 3/4” x 24”, bit through the

opening of the Panel Base Connector into the footing or foundation.

5. Clean/vacuum the concrete dust from each hole.

6. Place the 3/4” x 10” screw anchor though the Panel Base Connector

into the footing or foundation.

7. Torque anchor into the footing or foundation with a maximum of 150

ft.-lbs. Do not over-torque anchor.

8. Fill the access cavity with grout and finish flush with panel surface.

Position and fasten the

connector along the bottom

edge of the panel formwork.

Drill a 3/4” x 7” hole, using

a 3/4” x 24” bit, through the

opening of the connector into

the footing or foundation.

Place a 3/4” x 10” screw

anchor though the connector

and footing or foundation,

then torque to 150 ft-lbs.

Fill the cavity with

grout and finish

flush with surface.

File Type: pdf
Categories: Data Sheets