Steel Edge Nosing Data Sheet
HD Steel Edge Nosing
Heavy-duty joint edge protection and integrated load
transfer in a single assembly
High-traffic industrial floors and pavements require
precise load transfer, smooth slab-to-slab transition
and joint protection. All of these requirements are met
with the HD Steel Edge Nosing assembly.
A complete assembly includes the steel nosing,
studs, dowel plates and full-depth channel for joint
installations. The leave-in-place design eliminates
conventional slab edge forming costs.
The nosing prevents joint spalling and reduces repair
costs in high-traffic areas, like warehouses and
loading docks. Concrete expansion and contraction
takes place as the steel plate slides within the sleeve.
The installation conforms to ACI 302.1R Guide for
Concrete Floor and Slab Construction and ACI 360
Design of Slabs-on-Ground.
For high performance extended joint slabs
that open more than 3/8” such as cold storage
facilities, consult with SureBuilt or concrete slab
engineer for solution before ordering.
* Spacing shown based on ACI 360 Design of Slabs-on-Ground.
|
HD Steel Edge Nosing with Taper Dowel |
||||
|
Part No. |
Description |
Slab |
Plate Size |
Spacing* |
|
SBHDSEN6 |
HD Steel Edge Nosing 6”x10’ |
6” |
1/4” x 4-1/2” x 4-1/2” |
18” |
|
SBHDSEN6WC |
HD Steel Edge Nosing 6”x10’ w/Clip |
6” |
1/4” x 4-1/2” x 4-1/2” |
18” |
|
SBHDSEN7 |
HD Steel Edge Nosing 7”x10’ |
7” |
3/8” x 4-1/2” x 4-1/2” |
18” |
|
SBHDSEN7WC |
HD Steel Edge Nosing 7”x10’ w/Clip |
7” |
3/8” x 4-1/2” x 4-1/2” |
18” |
|
SBHDSEN8 |
HD Steel Edge Nosing 8”x10’ |
8” |
3/8” x 4-1/2” x 4-1/2” |
18” |
|
SBHDSEN8WC |
HD Steel Edge Nosing 8”x10’ w/Clip |
8” |
3/8” x 4-1/2” x 4-1/2” |
18” |
2525 Armitage Ave
Melrose Park, IL 60160
708-493-9569
www.surebuilt-usa.com
03/26HD Steel Edge Nosing – Straight Line Installation
1. Check sub-grade for levelness and grade. Set
string line along the edge nosing path and position
the first length of HD Steel Edge Nosing. Ensure the
plastic sleeves go on the side where the first concrete
pour will occur.
2. Insert stakes through the welded clips attached to
the HD Steel Edge Nosing separation plate. Hammer
the stakes into ground until they are 2 inches below
the top of the joint. Additional staking and bracing
may be required to keep sections steady during the
concrete pour.
3. Adjust the height of the joint until it is level and at
the required slab depth. Turn the stakes 90 degrees
using a shifter to lock the joint in place.
4. The HD Steel Edge Nosing length has a lap joint at
either end used to bolt the separate lengths together.
Ensure a 1/8” gap is left between each length. This
allows for the lateral movement of the joint. Repeat
the process for each section until the desired length
is achieved.
5. Install any required concrete reinforcing. Pour the
concrete ensuring vibration along the joint at regular
intervals. The top of the HD Steel Edge Nosing rails
can be used to screed along.
6. After the first pour has set, remove any additional
staking. Place the dowels through the separation
plate slots into the sleeves in the first pour before
pouring the second pour. Dowels should be placed
within 36 hours of the first pour.
Use 3/8” Ø Nylon bolt to connect nosings
Anchor Nosing using stakes or leveling standHD Steel Edge Nosing – T Intersection Installation
T Intersection InstallationHD Steel Edge Nosing – X Intersection Installation
The overlaps can be cut off in field and used as fillers at the end of the other 2 sections.
Weld filler to adjacent steel strip and weld corners in field.